16. Department of the Interior · Minor
Revisit leases and permits in the withdrawn energy and mineral areas
Printed page 523 16. Department of the Interior
“Meanwhile, revisit associated leases and permits for energy and mineral production in these areas in consultation with state elected officials.”
What has happened
- Partially done
The Twin Metals leases in the Boundary Waters area were revisited exactly as the Quote asks: the Deputy Secretary withdrew M-37072, which had held the leases improperly renewed and cancellable, and reinstated M-37049, the opinion that they were validly renewed — the memorandum noting that the 2022 opinion itself "acknowledged that the regulations at 43 C.F.R. § 3514.30(b) allow BLM to amend a lease rather than cancel it". Congress then voided the withdrawal (P.L. 119-85). No parallel action has been found for leases or permits in the Thompson Divide, and no allowlisted record of the consultation with state elected officials the Quote specifies. **Corrected 2026-09-06 (read-queue ticket 07):** the Chaco buffer is no longer untouched — on 2026-07-15 the BLM opened comment on a draft environmental assessment for revoking Public Land Order No. 7923 in full (#1472). That revisits the *withdrawal*, and would reopen 336,404 acres to leasing if adopted; it does not revisit any existing lease or permit, which is what this Quote asks for, and nothing has been decided. The rung is unchanged and the Twin Metals memorandum still carries it.
Research log
What was searched, and what didn’t count as evidence
Research notes
One of the three areas has been revisited; the other two have not, because their withdrawals still stand.
- Action
- other
- Object
- Leases and permits in Thompson Divide, Chaco buffer, and Boundary Waters areas
- ID
- 1474