Accelerate the Sentinel, LRSO, Columbia-class, B-21, and F-35 DCA programs

Partially done

Printed page 124 4. Department of Defense

“Accelerate the timelines of critical modernization programs including the Sentinel missile, Long Range Standoff Weapon (LRSO), Columbia-class ballistic missile submarine, B-21 bomber, and F-35 Dual Capable Aircraft.”

What has happened

  1. Partially done

    The FY2026 NDAA adds schedule discipline rather than schedule compression. Sec. 1634 rewrites the B-21 nuclear certification requirement so the aircraft must be certified for nuclear gravity bombs within 180 days of initial operational capability and for the AGM-181 long-range standoff weapon within two years of either reaching IOC - the LRSO and the B-21 dual-capable mission the Quote names, now on a statutory clock. Sec. 1636 authorizes life-of-program contracts for Sentinel solid rocket motor nozzle material. Against that, sec. 1641 assumes Minuteman III must be sustained until Sentinel reaches full operational capacity, which is not what acceleration looks like.

  2. Partially done

    Section 20008(a) of the reconciliation act (P.L. 119-21) put acceleration money against four of the five programs the Quote names: $2,500,000,000 for Sentinel risk reduction, $4,500,000,000 only for expansion of B-21 production capacity and the aircraft that capacity makes available, $400,000,000 to accelerate development of the Trident D5LE2 submarine-launched ballistic missile that arms the Columbia class, $2,000,000,000 to accelerate the nuclear-armed sea-launched cruise missile and $150,000,000 to accelerate military nuclear weapons delivery programs generally. Nothing names the Long Range Standoff Weapon or the F-35 dual-capable aircraft.

Research log

What was searched, and what didn’t count as evidence

Research notes

Five-program ask read against both enacted instruments in full text. Four programs (Sentinel, B-21, Columbia via D5LE2, LRSO via the certification deadline) have in-window action; the F-35 dual-capable aircraft has none - the NDAA’s only F-35 provision is sec. 342, on sustainment spares and readiness.

  • Overlaps #212 (Sentinel alone) and #255 (SLCM-N). All three are leveled on the same reading of P.L. 119-21 sec. 20008.
Action
expand
Object
nuclear triad modernization programs
ID
252