12. Department of Energy and Related Commissions · Minor
Restore the bulk-power system security approach of EO 13920 and the 2020 Prohibition Order
Printed page 374 12. Department of Energy and Related Commissions
“Prioritize grid security. OE (along with CESER if they are combined) should focus on the security of critical infrastructure equipment used in the bulk power system as envisioned in President Trump’s May 2020 Executive Order 13920 and a related December 2020 Prohibition Order, which was revoked in April 2021 by President Biden.”
What has happened
- Partially done
DOE opened the implementation, and what it opened is a request for information rather than a prohibition order. Consistent with EO 14421, the Department is asking industry about the scope of covered equipment and transactions, the risks posed by Covered Foreign Entities, supply-chain and remote-access practices, existing equipment and mitigation, licensing and prequalification, domestic manufacturing and secure replacement capacity, and Federal procurement (docket DOE-2026-HQ-2026-1123). The half of the Quote that is still missing is unchanged by it: no Covered Foreign Entity is designated, no equipment is identified, and no successor to the December 2020 Prohibition Order exists. The `partial` repeats because the step is real and the rung is not.
- Partially done
EO 14421 restores the EO 13920 framework for bulk-power system equipment and gives the Secretary of Energy authority to condition, isolate, disconnect, replace or remove equipment already installed. Partial rather than done: no successor to the December 2020 Prohibition Order has been issued, no Covered Foreign Entity has been designated and no equipment has been identified; the implementing rules are due within 120 days of the order. Neither the Office of Electricity nor CESER has been given the grid-security charter the Quote describes.
Research log
What was searched, and what didn’t count as evidence
Research notes
This Quote is narrower than #944’s: it asks that OE, with CESER if the two are combined, focus on the security of critical bulk-power-system equipment as envisaged in EO 13920 and the related December 2020 Prohibition Order. The order half is restored; the prohibition-order half and the office-focus half are not.
FERC’s parallel move: on 23 September 2025 it directed NERC to develop supply-chain risk-management Reliability Standards addressing equipment and services from entities identified as national-security risks.
The 2026-09-09 request for information is the first Federal Register instrument DOE has issued under EO 14421. It was read only as its Federal Register title and abstract — this session had no network, so the questions themselves were not read at govinfo, and nothing above turns on their wording.
- Action
- restore
- Object
- December 2020 Prohibition Order on bulk power system equipment
- ID
- 948